Paper | Title | Page |
---|---|---|
TUPB074 | High-Vacuum Simulations and Measurements on the SSR1 Cryomodule Beam-Line | 754 |
|
||
Funding: Work supported by Fermi Research Alliance, LLC under Contract No. DEAC02- 07CH11359 with the United States Department of Energy In order to guarantee an effective cool-down process for the SSR1 cryomodule, a high-vacuum level must be achieved at room temperature in the beam-line before introducing gaseous and liquid helium. The SSR1 cavities in the beamline have a small beam aperture compared to the size of their internal volume. To avoid unnecessary complications for the vacuum piping of the cryomodule cold-mass, a pilot study was conducted on the string prior to processing and qualification of the components to investigate the vacuum level achievable by pumping only through the beam-line. To estimate the pressure distribution inside the cavity string we used a mathematical model implemented in a test-particle Monte-Carlo simulator for ultra-high-vacuum systems. |
||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml) | |