Paper | Title | Page |
---|---|---|
TUAA02 | Commissioning of the SRF Linac for ARIEL | 457 |
|
||
This paper is reporting commissioning results for the SRF linac of ARIEL facility at TRIUMF. The paper is focused on the SRF challenges: cavity design and performance, ancillaries design and preparation, cryomodule design and performance, RF system and final beam test results. | ||
![]() |
Slides TUAA02 [4.004 MB] | |
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml) | |