Assembly and Cool-Down Tests of STF2 Cryomodule at KEK |
888 |
|
- T. Shishido, K. Hara, E. Kako, Y. Kojima, H. Nakai, Y. Yamamoto
KEK, Ibaraki, Japan
|
|
|
As the next step of the quantum beam project, the STF2 project is in progress at KEK. Eight 9-cell SC cavities and one superconducting quardrapole magnet were assembled into the cryomodule called CM1. Four 9-cell SC cavities were assembled into the cryomodule called CM2a. These two cryomodules were connected as one unit, and the examination of completion by a prefectural government was carried out. The target value of beam energy in the STF2 accelerator is 400 MeV with a beam current of 6 mA. The first cool down test for low power level RF measurements was performed in autumn of 2014. In this paper, the assembly procedure of the STF2 cryomodules and the results of the low-power measurement are reported.
|
|