Author: Therasse, M.
Paper Title Page
TUPO058 CERN SRF Assembling and Test Facilities 530
 
  • J.K. Chambrillon, O. Brunner, P. Maesen, O. Pirotte, M. Therasse, B. Vullierme, W. Weingarten
    CERN, Geneva, Switzerland
 
  CERN is currently upgrading and refurbishing its RF and cryogenic facilities in the SM18 assembly hall with the aim of testing SRF cavities and cryo-modules of various provenience. They concern new and spare cavities for the HIE-ISOLDE upgrade, SPL study and LHC collider. These projects require a redistribution of space, refurbishment of cleanrooms, modification of SRF test stands, of vertical cryostats and of the lHe supply line. This poster presents the specifications of the refurbished facility and the technical choices required for the assembling, processing and testing of superconducting RF cavities.  
 
THIOB07 HIE-ISOLDE quarter wave Nb/Cu cavity 686
 
  • M. Pasini, S. Calatroni, O. Capatina, A. D'Elia, M.A. Fraser, M. Therasse
    CERN, Geneva, Switzerland
  • M. Pasini
    Instituut voor Kern- en Stralingsfysica, K. U. Leuven, Leuven, Belgium
 
  The HIE-ISOLDE project aims at the energy boost of the radio active beams produced in the ISOLDE facility from 3 MeV/u up to 5.5 MeV/u in a first stage and 10 MeV/u as ultimate installation. The beam acceleration is mainly achieved by employing 20 Nb sputtered Quarter Wave Resonator at β = 0.1 for which an R&D program has started. RF and mechanical design as well as the latest results of the sputtering process are reported in this paper.  
slides icon Slides THIOB07 [4.042 MB]