Author: Konomi, T.
Paper Title Page
TUPO014 High Gradient Results of ICHIRO 9-Cell Cavity in Collaboration With KEK and Jlab 386
 
  • F. Furuta, T. Konomi, K. Saito
    KEK, Ibaraki, Japan
  • G.V. Eremeev, R.L. Geng
    JLAB, Newport News, Virginia, USA
 
  KEK and Jlab have continued S0-study collaboration on ICHIRO 9-cell cavities since 2008. In 2010, we have started S0 study on ICHIRO#7, full 9-cell cavity with end groups. Surface treatments and vertical tests have been repeated at Jlab. Maximum gradient of 40MV/m was achieved so far. We will describe the details of that and further plan of S0-study on ICHIRO 9-cell.  
poster icon Poster TUPO014 [1.682 MB]  
 
MOPO038 Development of the Demountable Damped Cavity 172
 
  • T. Konomi
    Sokendai, Ibaraki, Japan
  • F. Furuta, K. Saito
    KEK, Ibaraki, Japan
  • F. Yasuda
    The University of Tokyo, Institute of Physics, Tokyo, Japan
 
  We have designed a new HOM free cavity named Demountable Damped Cavity (DDC) as an ILC R&D. DDC has two design concepts. The first one is an axial symmetry to eliminate kick off effect by HOM coupler itself. DDC is applied coaxial structure along the beam axis to make strong coupling with HOM. HOM is damped on RF absorber at the end of coaxial waveguide and the accelerating mode is reflected by the choke filter mounted on the entrance of coaxial waveguide. The second concept is demountable structure which can make cleaning of end group easy in order to suppress the Q-slope problem at high field. MO sealing will be applied for the demountable joint. We have simulated the HOM damper structure, thermal structure, and the multipacting phenomena on single DDC. We have also simulated how DDC works on ICHIRO 9-cell cavity. Now we are fabricating single DDC. Cold test is also planned. In this paper, we will present the results of them.  
 
THPO013 Investigation of 9-Cell Cavity Performance Problem by Facilities in KEK AR East 2nd Experimental Hall 733
 
  • K. Saito, F. Furuta
    KEK, Ibaraki, Japan
  • T. Konomi
    Sokendai, Ibaraki, Japan
  • F. Yasuda
    The University of Tokyo, Institute of Physics, Tokyo, Japan
 
  So far our 9-cell cavity performance is often suffered from field emission. We are investigating our facilities at the KEK AR East 2nd experimental hall. We examined two points of view post EP/BCP cleaning and particle contamination. Particle contamination problem has been found in our HPR system, cavity assembly, and vacuum evacuation procedure. We have taken cures against these problems. We will report about these problems and the cured results on cavity performance in this paper.  
poster icon Poster THPO013 [3.259 MB]