Paper | Title | Page |
---|---|---|
MOPO013 | RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility | 79 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the full cryomodule have been performed. We report on the results of these tests and lessons learned which will have an impact on future module testing at Fermilab. |
||
![]() |
Poster MOPO013 [3.894 MB] | |
THPO037 | Lorentz Force Detuning Compensation in Fermilab Cryomodule 1 | 801 |
|
||
Cryomodule 1 of the Fermilab SRF Accelerator Test Facility has recently been commissioned. First results are presented from the simultaneous compensation of Lorentz force detuning in all eight of the 1.3 GHz Tesla style superconducting cavities. | ||
![]() |
Poster THPO037 [0.958 MB] | |