MOPO020 | Nine-cell Elliptical Cavity Development at TRIUMF | 107 |
|
||
The superconducting e-Linac project at TRIUMF requires a new nine cell elliptical cavity at 1.3GHz of TESLA influenced design capable of providing a CW accelerating voltage of 10MV at 10mA of beam intensity. This corresponds to a challenging 100kW of beam loaded rf power and a Beam Break-up (BBU)threshold in multi-pass mode of Rd/Q*QL=10MOhms. For this purpose we use two opposed CPI 60kW cw rated couplers. Another challenge is to provide HOM damping for the possibility of multi-pass ERL operation by means of end cell optimization and higher order mode (HOM) dampers. Results of the cavity design work including developments toward a passive HOM damper will be discussed. | ||