A   B   C   D   E   F   G   H   I   J   K   L   M   N   P   R   S   T   V   X  

klystron

Paper Title Other Keywords Page
THP33 High Power Input Coupler for KEKB SC Cavity and New 1 MW Test Bench KEK, KEKB, cavity, superconducting-cavity 703
 
  • S. Mitsunobu, K. Akai, K. Ebihara, T. Furuya, S. Isagawa, H. Nakanishi, M. Ono, M. Yamaga
    KEK, Ibaraki
  • Y. Sun
    IHEP Beijing, Beijing
  • Y. Kijima
    Mitsubisi Electric Co. Ltd., Tokyo
  • T. Tanaka
    Furukawa Electric Co. Ltd., Tokyo
 
THP36 RF System Modelling for the JLAB 12 GeV Upgrade and RIA cavity, controls, RIA, simulation 714
 
  • S. Simrock
    DESY, Hamburg
  • J.R. Delayen, A. Hofler, C. Hovater
    JLAB, Newport News