Paper | Title | Page |
---|---|---|
WEPSM11 | The Intermediate-Energy X-ray (IEX) Undulator Commissioning Results | 1070 |
|
||
Funding: Work supported by the U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357. Strong beam perturbation from the intermediate-energy x-ray (IEX) undulator operation has been expected from the beginning. This paper describes our efforts including the initial magnet design, field measurements and compensation, special considerations of power supplies and the control system, and the final commissioning results with beam. Perturbations are well within the specified limits, and the IEX was made ready for user operation in less than six months. |
||