Author: Roybal, R.J.
Paper Title Page
MOPMA14 Status of the LANSCE Front-End Upgrade 327
 
  • R.W. Garnett, Y.K. Batygin, I. Draganić, C.M. Fortgang, S.S. Kurennoy, R.C. McCrady, J.F. O'Hara, R.J. Roybal, L. Rybarcyk
    LANL, Los Alamos, New Mexico, USA
  • J. Haeuser
    Kress GmbH, Biebergemuend, Germany
  • A. Schempp
    IAP, Frankfurt am Main, Germany
 
  Funding: Work supported by the United States Department of Energy, National Nuclear Security Agency, under contract DE-AC52-06NA25396
Initial acceleration of the beams in the LANSCE linear accelerator at Los Alamos National Laboratory is still presently accomplished through the use of two 750-keV Cockcroft-Walton (CW) based injectors. To reduce long-term operational risks and to realize future beam performance goals, plans are underway to replace the existing H+ CW injector with a modern replacement, 4-rod Radio-Frequency Quadrupole (RFQ) based front end. Significant technical progress has been made since we last reported on this project. Status and progress of the design and fabrication of the RFQ, the RF system, beam transports, and integrated accelerator test stand will be discussed.