Paper | Title | Page |
---|---|---|
THPMA10 | Energy Deposition in Magnets and Shielding of the Target System of a Staged Neutrino Factory | 1376 |
|
||
A first stage of a Neutrino Factory based on muon beams might use a pulsed 3-GeV proton beam with 1-MW average power. We report on MARS15 studies of energy deposition in the superconducting magnets and the tungsten-bead shielding of the Target System. | ||