WEOBS6 Status and Specifications of a Project X Front-End Accelerator Test Facility at Fermilab 1430
 
  • J. Steimel, R.L. Madrak, R.J. Pasquinelli, E. Peoples-Evans, R.C. Webber, D. Wildman
    Fermilab, Batavia, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility.
 
slides icon Slides WEOBS6 [2.401 MB]  
 
TUP076 First High Power Pulsed Tests of a Dressed 325 MHz Superconducting Single Spoke Resonator at Fermilab 964
 
  • R.L. Madrak, J. Branlard, B. Chase, C. Darve, P.W. Joireman, T.N. Khabiboulline, A. Mukherjee, T.H. Nicol, E. Peoples-Evans, D.W. Peterson, Y.M. Pischalnikov, L. Ristori, W. Schappert, D.A. Sergatskov, W.M. Soyars, J. Steimel, I. Terechkine, V. Tupikov, R.L. Wagner, R.C. Webber, D. Wildman
    Fermilab, Batavia, USA
 
  In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, β=0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Qext test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. For the tests described here, the design input coupler with Qext ~ 106 was used. Pulsed power was provided by a Toshiba E3740A 2.5 MW klystron.