Author: Theisen, C.
Paper Title Page
TUP284 AGS Tune Jump System to Cross Horizontal Depolarization Resonances Overview 1361
 
  • J.W. Glenn, L. A. Ahrens, Z. Altinbas, W. Fu, J.-L. Mi, P.J. Rosas, V. Schoefer, C. Theisen
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Two partial snakes overcome the vertical depolarizing resonances in the AGS. But a new type of depolarizing intrinsic resonance from horizontal motion appeared. We reduce these using horizontal tune jumps timed to these resonances. We gain a factor of five in crossing rate with a tune jump of 0.04 in 100 micro-sec. Two quadrapoles, we described in 2009 *, pulse 42 times, the current matching beam energy. The power supplies for these quads will be described in this conference**. The controls for the Jump Quad system is based on a BNL designed Quad Function Generator. Two modules are used; one for timing, and one to supply reference voltages. Synchronization is provided by a proprietary serial bus, the Event Link. The AgsTuneJump application predicts the times of the resonances during the AGS cycle and calculates the power supply trigger times from externally collected tune and energy verses time data and the Low and High PS voltage functions from a voltage to current model of the power supply. The system was commissioned during runs 09 & 10. Beam effects are described elsewhere in this conference***. Details of improvements, operation and the feed forward software will be described.
* JW Glenn, et al “AGS Fast Spin Resonance,-” PAC-09
** JL Mi, et al “AGS Tune Jump Power-” these proceedings
*** L.A.Ahrens, et al "Recent RHIC Motivated Polarized-" these proceedings
 
 
TUP225 Overview of Recent Studies and Modifications Being Made to RHIC to Mitigate the Effects of a Potential Failure to the Helium Distribution System 1241
 
  • J.E. Tuozzolo, D. Bruno, A. Di Lieto, G. Heppner, R. Karol, E.T. Lessard, C.J. Liaw, G.T. McIntyre, C. Mi, J. Reich, J. Sandberg, S.K. Seberg, L. Smart, T.N. Tallerico, R. Than, C. Theisen, R.J. Todd, R. Zapasek
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
In order to cool the superconducting magnets in RHIC, its helium refrigerator distributes 4.5 K helium throughout the tunnel via a series of distribution and return lines. The worst case for failure would be a release from the magnet distribution line, which operates at 3.5 to 4.5 atmospheres and contains the energized magnet bus. Should the bus insulation system fail or an electrical connection open, there is the potential for releasing up to 70 MJoules of stored energy. Studies were done to determine release rate of the helium and the resultant reduction in O2 concentration in the RHIC tunnel and service buildings. Equipment and components were also reviewed for reliability and the effects of 10 years of operations. Modifications were made to reduce the likelihood of failure and to reduce the amount of helium gas that could be released into tunnels and service buildings while personnel are present. This paper describes the issues reviewed, the steps taken, and remaining work to be done to reduce the hazards.
 
 
WEP261 Performance of the New EBIS Preinjector 1966
 
  • J.G. Alessi, E.N. Beebe, S. Binello, C.J. Gardner, O. Gould, L.T. Hoff, N.A. Kling, R.F. Lambiase, V. LoDestro, R. Lockey, M. Mapes, A. McNerney, J. Morris, M. Okamura, A. Pendzick, D. Phillips, A.I. Pikin, D. Raparia, J. Ritter, T.C. Shrey, L. Smart, L. Snydstrup, C. Theisen, M. Wilinski, A. Zaltsman, K. Zeno
    BNL, Upton, Long Island, New York, USA
  • U. Ratzinger, A. Schempp
    IAP, Frankfurt am Main, Germany
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy, and by the National Aeronautics and Space Administration.
The construction and initial commissioning phase of a new heavy ion preinjector was completed at Brookhaven in September, 2010, and the preinjector is now operational. This preinjector, using an EBIS source to produce high charge state heavy ions, provided helium and neon ion beams for use at the NASA Space Radiation Laboratory in the Fall of 2010, and gold and uranium beams are being commissioned during the 2011 run cycle for use in RHIC. The EBIS operates with an electron beam current of up to 10 A, to produce mA level currents in 10 to 40 μs beam pulses. The source is followed by an RFQ and IH linac to accelerate ions with q/m > 0.16 to an energy of 2 MeV/amu, for injection into the Booster synchrotron. The performance of the preinjector is presented, including initial operational experience for the NASA and RHIC programs.