Author: Spataro, C.J.
Paper Title Page
TUP149 Magnetic Field Mapping and Integral Transfer Function Matching of the Prototype Dipoles for the NSLS-II at BNL 1112
 
  • P. He, M. Anerella, G. Ganetis, R.C. Gupta, A.K. Jain, P.N. Joshi, J. Skaritka, C.J. Spataro, P. Wanderer
    BNL, Upton, Long Island, New York, USA
 
  The National Synchrotron Light Source-II (NSLS-II) storage ring at Brookhaven National Laboratory (BNL) will be equipped with 54 dipole magnets having a gap of 35 mm, and 6 dipoles having a gap of 90 mm. The large aperture magnets are necessary to allow the extraction of long-wavelength light from the dipole magnet to serve a growing number of users of low energy radiation. The dipoles must not only have good field homogeneity (0.015% over a 40 mm x 20 mm region), but the integral transfer functions and integral end harmonics of the two types of magnets must also be matched. The 35 mm aperture dipole has a novel design where the yoke ends are extended up to the outside dimension of the coil using magnetic steel nose pieces. A Hall probe mapping system has been built with three Group 3 Hall probes mounted on a 2-D translation stage. The probes are arranged with one probe in the midplane of the magnet and the others vertically offset by ±10 mm. The field is mapped along a nominal 25 m radius beam trajectory. The results of measurements in the as-received magnets, and with modifications made to the nose pieces will be presented.  
 
WEP017 Re-Examination of the NSLS-II Magnet Multipole Specifications 1531
 
  • W. Guo, A.K. Jain, S. Krinsky, S. Seiler, J. Skaritka, C.J. Spataro
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy
The NSLS-II magnet multipole specifications were determined based on analysis of nonlinear beam dynamics. The required field quality does not exceed what was specified for the existing third-generation light sources. While the prototype magnets have met these specifications, the magnets from mass production could potentially have bigger errors which exceed certain tolerances. In this paper we discuss the results of recent calculations to provide further insight into the acceptable range of the magnet multipoles based on the physics requirements.
 
 
THOBS4 Current Status of Insertion Device Development at the NSLS-II and its Future Plans 2090
 
  • T. Tanabe, O.V. Chubar, T.M. Corwin, D.A. Harder, P. He, C.A. Kitegi, G. Rakowsky, J. Rank, C. Rhein, C.J. Spataro
    BNL, Upton, Long Island, New York, USA
 
  Funding: This manuscript has been authored by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH1-886 with the U.S. Department of Energy.
National Synchrotron Light Source-II (NSLS-II) project is currently under construction. Procurement of various insertion devices (IDs) has begun. IDs in the project baseline scope include six 3.5m long damping wigglers (DWs) with 100mm period, two 2.0m Elliptically Polarizing Undulator (EPU) with 49mm period, two 3.0m-20mm period IVUs and one 1.5m-21mm IVU. Recently a special device for inelastic X-ray scattering beamline has been added to the collection of baseline devices. This is a special wide pole IVU with 22mm period for a long straight section. Three pole wigglers with 28mm gap and peak field over 1T will be utilized for NSLS bending magnet users. Examples of R&D work for future devices are: 1) Development of in-vacuum magnetic measurement system (IVMMS), 2) Use of new type of magnet such as PrFeB for improved performance on cryo-permanent magnet undulator (CPMU), 3) Development of closed loop He gas refrigerator with a linear motor actuator, 4) Adaptive gap undulator (AGU) 5) Various field measurement technique improvement. Design features of the baseline devices, ID-Magnetic Measurement Facility and the future plans for NSLS-II ID activities are described.
 
slides icon Slides THOBS4 [4.171 MB]  
 
THP135 Implementation of a DC Bump at the Storage Ring Injection Straight Section 2378
 
  • G.M. Wang, R.P. Fliller, W. Guo, R. Heese, S.L. Kramer, B. Parker, T.V. Shaftan, C.J. Spataro, F.J. Willeke, L.-H. Yu
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE, Contract No.DE-AC02-98CH10886
The NSLS II beam injection works with two septa and four fast kicker magnets. The kicker power supplies each produce a two revolution periods pulsed field, 5.2μs half sine waveform, using ~5kV drive voltage. The corresponding close orbit bump amplitude is ~15mm. It is desired that the bump they produce is transparent to the users for top-off injection. However, high voltage and short pulse power supplies have challenges to maintain pulse-to-pulse stability and magnet-to-magnet reproducibility. To minimize these issues, we propose to implement a DC local bump on top of the fast bump to reduce the fast kicker strength by a factor of 2/3. This bump uses two ring corrector magnets plus one additional magnet at the septum to create a bump. Additionally, these magnets could provide a DC bump, which would simulate the effects of a movable septum on the store beam lifetime. This paper presents the detail design of this DC injection bump and related beam dynamics.
 
 
THP216 Progress with NSLS-II Injection Straight Section Design 2528
 
  • T.V. Shaftan, A. Blednykh, W.R. Casey, L.R. Dalesio, R. Faussete, M.J. Ferreira, R.P. Fliller, G. Ganetis, R. Heese, H.-C. Hseuh, P.K. Job, E.D. Johnson, B.N. Kosciuk, S. Kowalski, S.L. Kramer, D. Padrazo, B. Parker, I. Pinayev, S.K. Sharma, O. Singh, C.J. Spataro, G.M. Wang, F.J. Willeke
    BNL, Upton, Long Island, New York, USA
 
  Funding: This work is supported by U.S. DOE, Contract No.DE-AC02-98CH10886
NSLS-II injection straight section consists of the pulsed and DC/Slow bumps, septa system, beam trajectory correction and diagnostics systems. In this paper we discuss overall injection straight layout, preliminary element designs, specifications for the pulsed and DC magnets and their power supplies, vacuum devices and chambers and diagnostics devices.