Author: Popken, P.
Paper Title Page
MOP268 RHIC 10 Hz Global Orbit Feedback System 609
 
  • R.J. Michnoff, L. Arnold, C. Carboni, P. Cerniglia, A.J. Curcio, L. DeSanto, C. Folz, C. Ho, L.T. Hoff, R.L. Hulsart, R. Karl, C. Liu, Y. Luo, W.W. MacKay, G.J. Mahler, W. Meng, K. Mernick, M.G. Minty, C. Montag, R.H. Olsen, J. Piacentino, P. Popken, R. Przybylinski, V. Ptitsyn, J. Ritter, R.F. Schoenfeld, P. Thieberger, J.E. Tuozzolo, A. Weston, J. White, P. Ziminski, P. Zimmerman
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Vibrations of the cryogenic triplet magnets at the Relativistic Heavy Ion Collider (RHIC) are suspected to be causing the beam perturbations observed at frequencies around 10 Hz. Several solutions to counteract the effect have been considered in the past, including reinforcing the magnet base support assembly, a mechanical servo feedback system, and a local beam feedback system at each of the two experimental areas. However, implementation of the mechanical solutions would be expensive, and the local feedback system was insufficient since perturbation amplitudes outside the experimental areas were still problematic. A global 10 Hz orbit feedback system is currently under development at RHIC consisting of 36 beam position monitors (BPMs) and 12 small dedicated dipole corrector magnets in each of the two counter-rotating rings. A subset of the system consisting of 8 BPMs and 4 corrector magnets in each ring was installed and successfully tested during the RHIC 2010 run; and the complete system is being installed for the 2011 run. A description of the overall system architecture and results with beam will be discussed.