Author: Pile, P.H.
Paper Title Page
MOP191 RHIC Spin Flipper Status and Simulation Studies 447
 
  • M. Bai, W.C. Dawson, Y. Makdisi, F. Méot, P. Oddo, C. Pai, P.H. Pile, T. Roser
    BNL, Upton, Long Island, New York, USA
 
  Funding: This work was supported by Department of Energy of U.S.A and RIKEN, Japan
The commissioning of the RHIC spin flipper in the RHIC Blue ring during the RHIC polarized proton run in 2009 showed the detrimental effects of global vertical coherent betatron oscillation induced by the 2-AC dipole plus 4-DC dipole configuration *. Additional three AC dipoles were added to the RHIC spin flipper in the RHIC Blue ring during the summer of 2010 to eliminate the vertical coherent betatron oscillations outside the spin flipper [2]. This new design is scheduled to be commissioned during the RHIC polarized proton run in 2011. This paper presents the status of the system as well as latest simulation results.
* M. Bai , T. Roser, C. Dawson, Y. Makdisi, W. Meng, F. Meot, P. Oddo, C. Pai, P. Pile, RHIC Spin Flipper New Design and Commissioning Plan, IPAC10 proceedings, IPAC 2010, Kyoto, Japan, 2010