Paper | Title | Page |
---|---|---|
TUP076 | First High Power Pulsed Tests of a Dressed 325 MHz Superconducting Single Spoke Resonator at Fermilab | 964 |
|
||
In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, β=0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Qext test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. For the tests described here, the design input coupler with Qext ~ 106 was used. Pulsed power was provided by a Toshiba E3740A 2.5 MW klystron. | ||
TUP079 | Cryomodule Design for 325 MHz Superconducting Single Spoke Cavities and Solenoids | 970 |
|
||
Funding: U.S. Department of Energy The low-beta section of the linac being considered for Project X at Fermilab contains several styles of 325 MHz superconducting single spoke cavities and solenoid based focusing lenses, all operating at 2 K. Each type of cavity and focusing lens will eventually be incorporated into the design of cryomodules unique to various sections of the linac front end. This paper describes the design of a multiple-cavity and solenoid cryomodule being developed to test the function of each of the main cryomodule systems – cryogenic systems and instrumentation, cavity and lens positioning and alignment, conduction-cooled current leads, magnetic shielding, cold-to-warm beam tube transitions, interfaces to interconnecting equipment and adjacent modules, as well as evaluation of overall assembly procedures. |
||
TUP080 | Tests of a Tuner for a 325 MHz SRF Spoke Resonator | 973 |
|
||
Funding: Work is supported by the U.S. Department of Energy Fermilab is developing 325 MHz SRF spoke cavities for the proposed ProjectX. A compact fast/slow tuner has been developed to compensate microphonics and Lorentz force detuning. The modified tuner design and results of 4K tests of the first prototype are presented. |
||
WEOBS6 | Status and Specifications of a Project X Front-End Accelerator Test Facility at Fermilab | 1430 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility. |
||
![]() |
Slides WEOBS6 [2.401 MB] | |