Author: Kramer, S.L.
Paper Title Page
MOP274 Beam Loss Monitors for NSLS-II Storage Ring 621
 
  • S.L. Kramer, P. Cameron
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE, Contract No.DE-AC02-98CH10886
The shielding for the NSLS-II storage ring will provide adequate protection for the full injected beam losses in two periods of the ring around the injection point, but the remainder of the ring is shielded for lower losses of <10% top-off injection beam current. This will require a system to insure that beam losses do not exceed these levels for a period of time that could cause excessive radiation exposure outside the shield walls. This beam Loss Control and Monitoring system will have beam loss monitors that will measure where the beam charge is lost around the ring, to warn operators if losses approach the design limits. In order to measure the charge loss quantitatively, we propose measuring the electron component of the shower as beam electrons hit the vacuum chamber wall. This will be done using the Cerenkov light as charged particles transit an ultra-pure fused silica rod placed close to the inner edge of the VC. The length of rod will collect the light from many charged particles of the spread out shower resulting from the small glancing angle of the lost beam particles to the VC wall. The design and measurements results of the prototype Cerenkov BLM will be presented.
 
 
MOP275 Beam Loss Control for the NSLS-II Storage Ring 624
 
  • S.L. Kramer, J. Choi
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE, Contract No.DE-AC02-98CH10886
The shielding design for the NSLS-II storage ring is designed for the full injected beam losses in two periods of the ring around the injection point, but for the remainder of the ring its shielded for <10% top-off injection beam. This will require a system to insure that beam losses do not exceed these levels for time sufficient to cause excessive radiation exposure outside the shield walls. This beam Loss Control and Monitoring (LCM) system will control the beam losses to the more heavily shielded injection region while monitoring the losses outside this region. To achieve this scrapers are installed in the injection region to intercept beam particles that might be lost outside this region. The scrapers will be thin (< 1Xrad) that will allow low energy electrons to penetrate and the subsequent dipole will separate them from the stored beam. These thin scrapers will reduce the radiation from the scraper compared to thicker scrapers. The dipole will provide significant local shielding for particles that hit inside the gap and a source for the loss monitor system that will measure the amount of beam lost in the injection region.
* Beam Loss Monitors for NSLS-II Storage Ring, S.L. Kramer & P. Cameron, these proceedings
 
 
THP127 Analysis of NSLS-II Touschek Lifetime 2360
 
  • J. Choi, S.L. Kramer
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by DOE contract DE-AC02-98CH10886
As scrapers are adopted for the loss control of NSLS-II storage ring, Touschek lifetime estimations for various cases are required to assure the stable operation. However, to estimate the Touschek lifetime, momentum apertures should be measured all along the ring and, if we want to estimate the lifetime in various situations, it can take extremely long time. Thus, rather than simulating for each case, semi-analytic methods with the interpolations are used for the measurements of the momentum apertures. In this paper, we described the methods and showed the results.
 
 
THP134 Lifetime Measurement with Pseudo Moveable Septum in NSLS X-ray Ring 2375
 
  • G.M. Wang, J. Choi, R. Heese, S.L. Kramer, T.V. Shaftan, X. Yang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE, Contract No.DE-AC02-98CH10886
The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source currently under construction at Brookhaven National Laboratory and starts to commission in 2014. The beam injection works with two septa and four fast kicker magnets in an injection section. To improve the injection stability and reproducibility, we plan to implement a slow local bump on top of the fast bump so that the fast kicker strength is reduced. This bump works as a pseudo movable septum. We can also use this ‘movable’ septum to measure the storage ring beam partial lifetime resulting from the septum edge and possibly increasing the lifetime by moving the stored beam orbit away from the edge. We demonstrate the feasibility of this idea, by implementing DC bump in NSLS X-ray ring. We report the results of beam lifetime measurements as a function of the amplitude of this bumped orbit relative to the septum and the idea of a slow bump that could reduce the fast bump magnet strengths.
 
 
THP135 Implementation of a DC Bump at the Storage Ring Injection Straight Section 2378
 
  • G.M. Wang, R.P. Fliller, W. Guo, R. Heese, S.L. Kramer, B. Parker, T.V. Shaftan, C.J. Spataro, F.J. Willeke, L.-H. Yu
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE, Contract No.DE-AC02-98CH10886
The NSLS II beam injection works with two septa and four fast kicker magnets. The kicker power supplies each produce a two revolution periods pulsed field, 5.2μs half sine waveform, using ~5kV drive voltage. The corresponding close orbit bump amplitude is ~15mm. It is desired that the bump they produce is transparent to the users for top-off injection. However, high voltage and short pulse power supplies have challenges to maintain pulse-to-pulse stability and magnet-to-magnet reproducibility. To minimize these issues, we propose to implement a DC local bump on top of the fast bump to reduce the fast kicker strength by a factor of 2/3. This bump uses two ring corrector magnets plus one additional magnet at the septum to create a bump. Additionally, these magnets could provide a DC bump, which would simulate the effects of a movable septum on the store beam lifetime. This paper presents the detail design of this DC injection bump and related beam dynamics.
 
 
THP216 Progress with NSLS-II Injection Straight Section Design 2528
 
  • T.V. Shaftan, A. Blednykh, W.R. Casey, L.R. Dalesio, R. Faussete, M.J. Ferreira, R.P. Fliller, G. Ganetis, R. Heese, H.-C. Hseuh, P.K. Job, E.D. Johnson, B.N. Kosciuk, S. Kowalski, S.L. Kramer, D. Padrazo, B. Parker, I. Pinayev, S.K. Sharma, O. Singh, C.J. Spataro, G.M. Wang, F.J. Willeke
    BNL, Upton, Long Island, New York, USA
 
  Funding: This work is supported by U.S. DOE, Contract No.DE-AC02-98CH10886
NSLS-II injection straight section consists of the pulsed and DC/Slow bumps, septa system, beam trajectory correction and diagnostics systems. In this paper we discuss overall injection straight layout, preliminary element designs, specifications for the pulsed and DC magnets and their power supplies, vacuum devices and chambers and diagnostics devices.