Paper | Title | Page |
---|---|---|
TUP060 | New HOM Coupler Design for High Current SRF Cavity | 925 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. Damping higher order modes (HOMs) significantly to avoid beam instability is a challenge for the high current Energy Recovery Linac-based eRHIC at BNL. To avoid the overheating effect and high tuning sensitivity, current, a new band-stop HOM coupler is being designed at BNL. The new HOM coupler has a bandwidth of tens of MHz to reject the fundamental mode, which will avoid overheating due to fundamental frequency shifting because of cooling down. In addition, the S21 parameter of the band-pass filter is nearly flat from first higher order mode to 5 times the fundamental frequency. The simulation results showed that the new couplers effectively damp HOMs for the eRHIC cavity with enlarged beam tube diameter and two 120° HOM couplers at each side of cavity. This paper presents the design of HOM coupler, HOM damping capacity for eRHIC cavity and prototype test results. |
||
FROBS6 | High Current SRF Cavity Design for SPL and eRHIC | 2589 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy In order to meet the requirements of high average current accelerators, such as the Superconducting Proton Linac (SPL) at CERN and the electron–ion collider (eRHIC) at BNL, a high current 5-cell SRF cavity, called BNL3 cavity, was designed. The optimization process aimed at maximizing the R/Q of the fundamental mode and the geometry factor G under an acceptable RF field level of Bpeak/Eacc or Epeak/Eacc. In addition, a pivotal consideration for the high current accelerators is efficient damping of dangerous higher-order modes (HOM) to avoid inducing emittance degradation, cryogenic loading or beam-breakup (BBU). To transport the HOMs out of the cavity, the BNL3 cavity employs a larger beam pipe, allowing the propagation of HOMs but not the fundamental mode. Moreover, concerning the BBU effect, the BNL3 cavity is aimed at low (R/Q)Qext for dangerous modes, including dipole modes and quadrupole modes. This paper presents the design of the BNL3 cavity, including the optimization for the fundamental mode, and the BBU limitation for dipole and quadrupole modes. The BBU simulation results show that the designed cavity is qualified for high-current, multi-pass machines such as eRHIC. |
||
![]() |
Slides FROBS6 [2.577 MB] | |
TUOAN2 | High Luminosity Electron-Hadron Collider eRHIC | 693 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. We present the design of future high-energy high-luminosity electron-hadron collider at RHIC called eRHIC. We plan on adding 20 (potentially 30) GeV energy recovery linacs to accelerate and to collide polarized and unpolarized electrons with hadrons in RHIC. The center-of-mass energy of eRHIC will range from 30 to 200 GeV. The luminosity exceeding 1034 cm-2 s-1 can be achieved in eRHIC using the low-beta interaction region with a 10 mrad crab crossing. We report on the progress of important eRHIC R&D such as the high-current polarized electron source, the coherent electron cooling and the compact magnets for recirculating passes. A natural staging scenario of step-by-step increases of the electron beam energy by builiding-up of eRHIC's SRF linacs and a potential of adding polarized positrons are also presented. |
||
![]() |
Slides TUOAN2 [4.244 MB] | |