A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Namkung, W.

Paper Title Page
TH1GRI03 Particle Accelerators in Korea 3058
 
  • W. Namkung
    POSTECH, Pohang, Kyungbuk
 
 

Funding: Work supported by MEST and PAL.


Recently the Korean government successfully completed a large-scale facility, called the KSTAR, a fully superconducting tokamak after joining in the ITER project. It made renewed interests in large-scale scientific facilities to promote basic and applied research capabilities. The next projects include a space project and particle accelerators. The immediate one in accelerator program is the PLS-upgrade, and its budget is now in the congress for FY2009. The others are in the middle of consensus making process: a heavy ion accelerator for rare isotopes and a new synchrotron light source other than the PLS-upgrade and the ongoing proton linac program. This paper will give an overview of the status and prospects of major particle accelerator initiatives in Korea. The paper will also include descriptions of the significant contributions undertaken by Korea through collaborations with major international facilities using particle accelerators. Finally, the paper will outline how industry, government and universities in Korea are collaborating on particle accelerator R&D.

 

slides icon

Slides

 
FR5REP080 Commissioning Status of 10-MeV Intense Electron Linac 4965
 
  • S.H. Kim, M.-H. Cho, W. Namkung, H.R. Yang
    POSTECH, Pohang, Kyungbuk
  • S.D. Jang, S.J. Park, Y.G. Son
    PAL, Pohang, Kyungbuk
  • J.-S. Oh
    NFRI, Daejon
 
 

Funding: This work is supported by KAPRA and POSTECH Physics BK21 Program.


An intense L-band electron linac is now being commissioned at ACEP (Advanced Center for Electron-beam Processing in Cheorwon, Korea) for irradiation applications. It is capable of producing 10-MeV electron beams with the 30-kW average beam power. For a high-power capability, we adopted the traveling-wave structure operated with the 2π/3-mode at 1.3 GHz. The structure is powered by a 25-MW pulsed klystron with 60-kW average RF power. The RF pulse length is 8 μs while the beam pulse length is 7 μs due to the filling time in the accelerating structure. The accelerating gradient is 4.2 MV/m at the beam current of 1.45 A which is the fully beam-loaded condition. In this paper, we present details of the accelerator system and commissioning status.