Paper | Title | Page |
---|---|---|
TU6RFP007 | Fermilab’s Booster Correction Element Power Supply Silicon Temperature Rise | 1544 |
|
||
Fermilab is in the process of upgrading its Booster Correction Element System to include full field correction element magnets to correct position and chromaticity throughout the booster cycle. From a reliability standpoint, it is important to limit both the maximum temperature and the repetitive temperature cycling of the silicon junctions of the switching elements. We will describe how we measured these parameters and the results of our measurements. |
||
TU6RFP008 | A Dual Triangle Timing Circuit for Improved Performance of 4-Quadrant H-Bridge Switchers | 1547 |
|
||
Fermilab is in the process of upgrading its Booster Correction Element System to include full field correction element magnets to correct position and chromaticity throughout the booster cycle. This upgrade requires power supplies with maximum outputs of ±180V/±65A, with current bandwidths of 5kHz and with slew rates of min to max current in 1ms. For seamless operation around zero current and voltage, we use continuous switching on both sides of the bridge. Although the straightforward way of coordinating the switching on both sides of the bridge can be accomplished with one triangle timing wave and one voltage reference, we have found that using two triangle waves yields a switching coordination that effectively doubles the frequency of the differential ripple on the load and allows for better and cheaper filtering of the output ripple. |
||
TU6RFP077 | Gap Clearing Kicker Magnet for Main Injector | 1729 |
|
||
Funding: Fermilab is operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. A fast kicker magnet has been designed for use in Main Injector at Fermilab. The magnet will be used for controlled removal of unbunched beam created in the slip stacking process. The strength of each of the six magnets is 75 G·m at 500 A. The aperture is 11.4 cm wide x 5.3 cm high x 64 cm long. The field rise time from 3% to 97% of less than 57 ns has been achieved along with a flattop variation of less than ±3% variation. Results of simulation and measurements will be presented. The pulser is described in a companion paper. |
||
TU6RFP078 | Extraction Kicker Pulser Design for Main Injector | 1732 |
|
||
Funding: Fermilab is operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. A fast kicker power supply has been designed for use in the Main Injector at Fermilab. The system will be used for controlled removal of unbunched beam created in the slip stacking process. A switch operating at 50 kV with a 3% to 97% rise time of less than 25 ns into a 50 Ω load is required. A thyratron and enclosure have been designed. A pulse length of 1.6 us is required so a cable pulse forming line is used. Results with and without a ferrite pulse sharpening line will be presented. The magnet is described in a companion paper. |