Chou, W.

Paper Title Page
TU6PFP058 A Hybrid Design of Project-X 1415
 
  • W. Chou
    Fermilab, Batavia
 
 

Funding: Work supported by the Fermi Research Alliance, LLC under contract No. DE-AC02-07CH11359 with the U.S. Dept. of Energy.


Project-X is a leading candidate of the next major accelerator construction project at Fermilab. The mission need of Project-X is to establish an intensity frontier for particle physics research, or more precisely, to build a multi-MW proton source for neutrino and other particle studies. Coupled with an upgraded Main Injector (MI) and Recycler, an 8 GeV superconducting RF (SRF) H linac meets this need. However, a more cost effective approach would be a hybrid design, namely, a combination of a 2 GeV SRF linac and an 8 GeV rapid cycling synchrotron (RCS) in lieu of an 8 GeV SRF linac. This alternative design also meets the mission need but at a lower cost since a synchrotron is cheaper than a SRF linac. It retains the ability to use a 2 GeV SRF linac for ILC technology development. It reuses the existing Debuncher enclosure and Booster RF. The transport line of 2 GeV H particles is shorter than the present 8 GeV design. The requirement of a cryogenic beam screen can be eliminated. The efficiency of stripping foil is higher and injection loss (kJ) will be lower.


*W. Chou, “A Simple Transition-Free Lattice of an 8 GeV Proton Synchrotron,” this conference.

 
TU6PFP060 Current and Future High Power Operation of Fermilab Main Injector 1421
 
  • I. Kourbanis, P. Adamson, B.C. Brown, D. Capista, W. Chou, D.K. Morris, K. Seiya, G.H. Wu, M.-J. Yang
    Fermilab, Batavia
 
 

Funding: Work supported by Fermi Research Alliance, LLC under contract No. DE-AC02-07CH11359 with the United States Department of Energy.


Currently Main Injector delivers 330KW of beam power at 120 GeV by using multi-batch slip stacking. The beam power is expected to increase to 400KW after installing clearing gap kickers to eliminate the injection kicker gap loss. The plan to increase the beam power to 700KW for NOvA and the role of MI in Project-X (2.1MW operation) will be discussed.

 
TH6PFP052 A Simple Transition-Free Lattice of an 8 GeV Proton Synchrotron 3823
 
  • W. Chou
    Fermilab, Batavia
 
 

Funding: Work supported by the Fermi Research Alliance, LLC under contract No. DE-AC02-07CH11359 with the U.S. Dept. of Energy.


A transition-free lattice is a basic requirement of a high-intensity medium-energy (several GeV) proton synchrotron in order to eliminate beam losses during transition crossing. An 8 GeV synchrotron is proposed as a principal component in an alternative hybrid design of Project-X. This machine would be housed in the Fermilab antiproton source enclosure replacing the present Debuncher. A simple doublet lattice with high transition gamma has been designed. It uses just one type of dipoles and one type of quadrupoles (QF and QD are of the same length). It has no transition crossing. It has a triangular shape with three zero dispersion straight sections, which can be used for injection, extraction, RF and collimators. The beta-functions and dispersion are low. This lattice has plenty of free space for correctors and diagnostic devices, as well as good optical properties including large dynamic aperture, weak dependence of lattice functions on amplitude and momentum deviation.


*W. Chou, “An Alternative Approach to Project X,” this conference.