A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Aryshev, A.S.

Paper Title Page
TH6PFP024 Beam Waist Manipulations at the ATF2 Interaction Point 3747
 
  • S. Bai, J. Gao, X.W. Zhu
    IHEP Beijing, Beijing
  • A.S. Aryshev
    JAI, Egham, Surrey
  • P. Bambade, T. Okugi
    KEK, Ibaraki
  • Y. Kamiya
    ICEPP, Tokyo
  • D.J. McCormick, M. Woodley
    SLAC, Menlo Park, California
  • M. Oroku, T. Yamanaka
    University of Tokyo, Tokyo
 
 

Funding: NSFC 10525525 and 10775154. CNRS-IN2P3 and ANR.


The ATF2 project is the final focus system prototype for ILC and CLIC linear collider projects, with a purpose to reach a 37nm vertical beam size at the interaction point. We report on techniques developed based on simulation studies to adjust the horizontal and vertical beam waists independently in the presence of errors, at two different IP locations where the beam size can be measured with different accuracies. During initial commissioning, we will start with larger than nominal β-functions at the IP, to reduce the effects from higher-order optical aberrations and thereby simplify the optical corrections needed. The first measurements in such intermediate β-configurations are reported.

 
TH6REP023 Micron Size Laser-Wire System at the ATF Extraction Line, Recent Results and ATF-II Upgrade 3997
 
  • A.S. Aryshev, V. Karataev
    JAI, Egham, Surrey
  • G.A. Blair, S.T. Boogert, G.E. Boorman, A. Bosco, L.C. Deacon
    Royal Holloway, University of London, Surrey
  • L. Corner, N. Delerue, B. Foster, F. Gannaway, D.F. Howell, L.J. Nevay, M. Newman, R. Senanayake, R. Walczak
    OXFORDphysics, Oxford, Oxon
  • H. Hayano, N. Terunuma, J. Urakawa
    KEK, Ibaraki
 
 

Funding: STFC LC-ABD Collaboration, Royal Society, Daiwa Foundation, Commission of European Communities under the 6th Framework Programme Structuring the European Research Area, contract number RIDS-011899


The KEK Accelerator Test Facility (ATF) extraction line laser-wire system has been upgraded, enabling the measurement of micron scale transverse size electron beams. The most recent measurements using the upgraded system are presented, including the major hardware upgrades to the laser transport, the laser beam diagnostics line, and the mechanical control systems.

 
FR1RAI03 ATF2 Commissioning 4205
 
  • A. Seryi, J.W. Amann, P. Bellomo, B. Lam, D.J. McCormick, J. Nelson, J.M. Paterson, M.T.F. Pivi, T.O. Raubenheimer, C.M. Spencer, M.-H. Wang, G.R. White, W. Wittmer, M. Woodley, Y.T. Yan, F. Zhou
    SLAC, Menlo Park, California
  • D. Angal-Kalinin, J.K. Jones
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • R. Apsimon, B. Constance, C. Perry, J. Resta-López, C. Swinson
    JAI, Oxford
  • S. Araki, A.S. Aryshev, H. Hayano, Y. Honda, K. Kubo, T. Kume, S. Kuroda, M. Masuzawa, T. Naito, T. Okugi, R. Sugahara, T. Tauchi, N. Terunuma, J. Urakawa, K. Yokoya
    KEK, Ibaraki
  • S. Bai, J. Gao
    IHEP Beijing, Beijing
  • P. Bambade, Y. Renier, C. Rimbault
    LAL, Orsay
  • G.A. Blair, S.T. Boogert, V. Karataev, S. Molloy
    Royal Holloway, University of London, Surrey
  • B. Bolzon, N. Geffroy, A. Jeremie
    IN2P3-LAPP, Annecy-le-Vieux
  • P. Burrows
    OXFORDphysics, Oxford, Oxon
  • G.B. Christian
    ATOMKI, Debrecen
  • J.-P. Delahaye, D. Schulte, R. Tomás, F. Zimmermann
    CERN, Geneva
  • E. Elsen
    DESY, Hamburg
  • E. Gianfelice-Wendt, M.C. Ross, M. Wendt
    Fermilab, Batavia
  • A. Heo, E.-S. Kim, H.-S. Kim
    Kyungpook National University, Daegu
  • J.Y. Huang, W.H. Hwang, S.H. Kim, Y.J. Park
    PAL, Pohang, Kyungbuk
  • Y. Iwashita, T. Sugimoto
    Kyoto ICR, Uji, Kyoto
  • Y. Kamiya
    ICEPP, Tokyo
  • S. Komamiya, M. Oroku, T.S. Suehara, T. Yamanaka
    University of Tokyo, Tokyo
  • A. Lyapin
    UCL, London
  • B. Parker
    BNL, Upton, Long Island, New York
  • T. Sanuki
    Tohoku University, Graduate School of Science, Sendai
  • A. Scarfe
    UMAN, Manchester
  • T. Takahashi
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • A. Wolski
    Cockcroft Institute, Warrington, Cheshire
 
 

ATF2 is a final-focus test beam line that attempts to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction is well advanced and beam commissioning of ATF2 has started in the second half of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

 

slides icon

Slides

 
TH6REP025 Development of the S-Band BPM System for ATF2 4003
 
  • A. Lyapin, B. Maiheu, M. Wing
    UCL, London
  • R. Ainsworth, A.S. Aryshev, S.T. Boogert, G.E. Boorman, S. Molloy
    Royal Holloway, University of London, Surrey
  • A. Heo, E.-S. Kim, H.-S. Kim
    Kyungpook National University, Daegu
  • Y. Honda, T. Tauchi, N. Terunuma
    KEK, Ibaraki
  • D.J. McCormick, J. Nelson, G.R. White
    SLAC, Menlo Park, California
  • S. Shin
    Fermilab, Batavia
  • D.R. Ward
    University of Cambridge, Cambridge
 
 

The ATF2 international collaboration is intending to demonstrate nanometre beam sizes required for the future Linear Colliders. An essential part of the beam diagnostics needed to achieve this goal is the high resolution cavity beam position monitors (BPMs). In this paper we report on the S-band system installed in the final focus region of the new ATF2 extraction beamline. It only includes 4 BPMs, but they are mounted on the most critical final focus magnets squeezing the beam down to 35 nm. We discuss both the design and the first operational experience with the system.