Paper | Title | Page |
---|---|---|
THP054 | Status of RF Sources in Super-Conducting RF Test Facility (STF) at KEK | 909 |
|
||
Phase 0.5 and Phase 1.0 of the Superconducting RF Test Facility (STF) have been developed since 2005 in KEK. We have completed the two rf-sources and they have been used for the evaluation for the components of power distribution system (PDS) and couplers which were installed in the 5m-cryomodules. We have developed some rf components which is used in the power distribution system(PDS). Phase 1.0 have been conducted now and we attempt the R&D of PDS required in ILC project. This report describes the recent status of the rf source of STF in KEK including the modulator, PDS and LLRF. |