Paper | Title | Page |
---|---|---|
MOP003 | Performance of the Control System for the J-PARC Linac | 52 |
|
||
Linac of J-PARC began to operate in November, 2006, and a achieved an initial performance in January, 2007. Afterwards, the beam supply to RCS begins, and it is operating extremely well with stability up to now. Here, the evaluation for comparison of the design and realities of architecture and performance of the LINAC control system are shown. Especially, the conceptual idea of function arrangement in the hierarchy of the control system architecture is shown. Now, the linac control system is in the second phase for the high power beam and reducing the beam loss, and the analysis of the system response identification for the high precision beam control is started. |