A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Pai, C.

Paper Title Page
TUP028 Status of High Current R&D Energy Recovery Linac at Brookhaven National Laboratory 453
 
  • A. Kayran, D. Beavis, I. Ben-Zvi, M. Blaskiewicz, J.M. Brennan, A. Burrill, R. Calaga, P. Cameron, X. Chang, K.A. Drees, G. Ganetis, D.M. Gassner, J.G. Grimes, H. Hahn, L.R. Hammons, A. Hershcovitch, H.-C. Hseuh, A.K. Jain, R.F. Lambiase, D.L. Lederle, V. Litvinenko, G.J. Mahler, G.T. McIntyre, W. Meng, T.C. Nehring, B. Oerter, C. Pai, D. Pate, D. Phillips, E. Pozdeyev, T. Rao, J. Reich, T. Roser, T. Russo, Z. Segalov, A.K. Sharma, J. Smedley, K. Smith, T. Srinivasan-Rao, J.E. Tuozzolo, G. Wang, D. Weiss, N. Williams, Q. Wu, K. Yip, A. Zaltsman
    BNL, Upton, Long Island, New York
  • H. Bluem, M.D. Cole, A.J. Favale, D. Holmes, J. Rathke, T. Schultheiss, A.M.M. Todd
    AES, Medford, NY
  • J.R. Delayen, L.W. Funk, H.L. Phillips, J.P. Preble
    JLAB, Newport News, Virginia
 
 

Funding: Work performed under contract No. DE-AC02-98CH10886 with the auspices of the DoE of United States.
An ampere class 20 MeV superconducting Energy Recovery Linac (ERL) is under construction at Brookhaven National Laboratory (BNL) for testing concepts for high-energy electron cooling and electron-ion colliders. One of the goals is to demonstrate an electron beam with high charge per bunch (~5 nC) and extremely low normalized emittance (~5 mm-mrad) at an energy of 20 MeV. Flexible lattice of ERL loop provides a test-bed for testing issues of transverse and longitudinal instabilities and diagnostics of intense cw e-beam. The superconducting 703 MHz rf photoinjector is considered as an electron source for such a facility. At first we develop the straight pass (gun – 5 cell cavity – beam stop) test for the SRF Gun performance studies. Then the novel injection line concept of emittance preservation at the lower energy will be tested at this ERL. In this paper we present the status and our plans for construction and commissioning of this facility.