A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Oguri, H.

Paper Title Page
MOP004 Operating Experience of the J-PARC Linac 55
 
  • K. Hasegawa, H. Asano, T. Ito, T. Kobayashi, Y. Kondo, H. Oguri, A. Ueno
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • S. Anami, Z. Fang, Y. Fukui, K. Ikegami, M. Kawamura, F. Naito, K. Nanmo, H. Tanaka, S. Yamaguchi
    KEK, Ibaraki
  • E. Chishiro, T. Hori, H. Suzuki, M. Yamazaki
    JAEA, Ibaraki-ken
  • Y. Namekawa, K. Ohkoshi
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

The J-PARC (Japan Proton Accelerator Research Complex) linac consists of an RFQ, a Drift Tube Linac and a Separated-type Drift Tube Linac. The beam commissioning of the linac started in November 2006 and 181 MeV acceleration was successfully achieved in January 2007. The linac has delivered beams to the 3 GeV Rapid Cycling Synchrotron for its commissioning, and then, the subsequent 50 GeV Main Ring Synchrotron and the neutron target commissioning. The linac uses 20 units of 324 MHz klystrons. As of May, 2008, the average number of filament hours exceeds 5,000 without serious troubles. The operating experience of the linac will be described in this paper.