MOP007 Status of the LINAC4 Project at CERN 64
 
  • M. Vretenar, C. Carli, R. Garoby, F. Gerigk, K. Hanke, A.M. Lombardi, S. Maury, C. Rossi
    CERN, Geneva
 
 

Linac4 is a 160 MeV, 40 mA H- linear accelerator which will be the source of particles for all CERN proton accelerators from 2013. Its construction has started in 2008, as part of a program for the progressive replacement or upgrade of the LHC injectors during the next decade. Linac4 will initially inject into the PS Booster and at a later stage into a 4 GeV Superconducting Proton Linac (SPL), which could ultimately be upgraded to high duty cycle operation. For this reason accelerating structures, rf hardware and shielding of Linac4 are dimensioned for higher duty from the initial phase. Linac4 is normal-conducting, 80 m long and consists of an rf volume ion source, an RFQ, a beam chopping section and a cascade of three different types of 352 MHz accelerating structures. Its main design requirements are high reliability, high beam brightness and low beam loss. The accelerator will be housed in an underground tunnel on the CERN site, which can eventually be extended to the SPL, with equipment installed in a surface building above. The main parameters, the status of the main components, the planning, the project organisation and the civil engineering infrastructure are presented.

 
TUP083 Diagnostics and Measurement Strategy for the CERN Linac 4 591
 
  • K. Hanke, G. Bellodi, J.-B. Lallement, A.M. Lombardi, B. Mikulec, M. Pasini, U. Raich, E.Zh. Sargsyan
    CERN, Geneva
  • H. Hori
    MPQ, Garching, Munich
 
 

Linac 4 is a 160 MeV H- linac which will become the new injector for CERN's proton accelerator chain. The linac will consist of 4 different rf structures, namely RFQ, DTL, CCDTL and PIMS running at 352.2 MHz with 2 Hz repetition rate and 0.4 ms pulse length. A chopper line ensures clean injection into the PS Booster. The combination of high frequency and a high-current, low-emittance beam calls for a compact design where minimum space is left for diagnostics. On the other hand, diagnostics is needed for setting up and tuning of the machine during both commissioning and operation. A measurement strategy and the corresponding choice of the diagnostic devices and their specific use in Linac4 are discussed in this paper.