TUP056 Beam Optics Studies and Commissioning Status of CTF3 530
 
  • P.K. Skowronski, S. Bettoni, R. Corsini, S. Döbert, F. Tecker
    CERN, Geneva
  • D. Alesini, C. Biscari
    INFN/LNF, Frascati (Roma)
  • Y.-C. Chao
    TRIUMF, Vancouver
 
 

The objective of the CLIC Test Facility CTF3 is to demonstrate the feasibility issues of the CLIC two-beam technology. CTF3 consists of an electron linac followed by a delay loop, a combiner ring and a two-beam test area. One issue studied in CTF3 is the efficient generation of a very high current drive beam, used in CLIC as the power source to accelerate the main beam to multi-TeV energies. The beam current is first doubled in the delay loop and then multiplied by a factor four in the combiner ring by interleaving bunches using transverse deflecting rf cavities. The combiner ring and the connecting transfer line have been put into operation in 2007. In this paper we give the status of the commissioning, present the results of the combination tests and illustrate in some detail the beam optics measurements, including response matrix analysis, dispersion measurement and applied orbit correction algorithms. We discuss as well the observation of a vertical beam break-up instability which is due to the vertical transverse mode in the horizontal rf deflectors used for beam injection and combination. We outline the attempted methods to mitigate the instability and their effectiveness.