Paper | Title | Page |
---|---|---|
MOP022 | The ALPI Super-Conducting Accelerator Upgrade for the SPES Project | 109 |
|
||
The SPES project* at Laboratori Nazionali di Legnaro foresees the contruction of a RIB facility based on a fission target driven by a 40 MeV proton beam. After the 238U carbide target the 1+ charged ions will be selected by a high resolution mass spectometer, charge enhanced by a charge breeder and accelerated up to 10 MeV/A for 132Sn. The Legnaro superconducting accelerator complex, PIAVE injector and ALPI main accelerator, in its present configuration fits the requirements for SPES post acceleration. Nevertheless an upgrade of its performaces both in overall transmission and final energy is needed and a solution which minimizes the impact on the present structures will be presented. *http://www.lnl.infn.it/~spes/ |