Paper | Title | Page |
---|---|---|
MOPAB044 | X-Band TDS Project | 184 |
|
||
Based on the success of the X-Band Transverse Deflecting Structure (TDS) diagnostic at LCLS*, a collaboration between DESY, PSI and CERN has formed with the aim of developing and building an advanced modular X-Band TDS system. The designed TDS has the new feature of providing variable polarization of the deflecting field**. The possibility of changing the orientation of the streaking field of the TDS to an arbitrary azimuthal angle allows for 3D characterization of the phase space using tomographic methods***. Moreover the complete 6D characterization of the beam phase space is possible by combining this technique with quadrupole scans and a dipole spectrometer. As this new cavity design requires very high manufacturing precision to guarantee highest azimuthal symmetry of the structure to avoid the deterioration of the polarization of the streaking field, the high precision tuning-free assembly procedures developed at PSI for the SwissFEL C-band accelerating structures will be used for the manufacturing****. The high-power rf system is based on the CERN-based X-band test stands. We summarize in this work the status of the projects and its main technical parameters.
* C. Behrens et al. , Nat. Comm. 4762 (2014). ** A. Grudiev, CLIC-note-1067 (2016). *** D. Marx et al., contribution to this conference proceedings. **** U. Ellenberger et al., FEL 2013, TUPS017. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB044 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAB040 | Status Update of the SINBAD-ARES Linac Under Construction at DESY | 1412 |
|
||
ARES (Accelerator Research Experiment at Sinbad) is a linear accelerator for the production of low charge (from few pC to sub-pC) electron bunches with 100 MeV energy, fs and sub-fs duration and excellent arrival time stability. This experiment is currently under construction at DESY Hamburg and it is foreseen to start operation by the beginning of 2018 with the commissioning of the RF-gun. After an initial beam characterization phase, ARES will provide high temporal resolution probes for testing novel acceleration techniques, such as Laser driven plasma Wake-Field Acceleration (LWFA), Dielectric Laser Acceleration (DLA) and THz driven acceleration. In this work we present an overview of the present design of the linac with a special focus on 3D integration and planned installation phases of the beamline. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPAB040 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THOAA3 | Installation and First Commissioning of the LLRF System for the European XFEL | 3638 |
|
||
The installation phase of the European X-ray free laser electron laser (XFEL) is finished, leaving place for its commissioning phase. This contribution summarizes the low-level radio frequency (LLRF) installation steps, illustrated with examples of its challenges and how they were addressed. The commissioning phase is also presented, with a special emphasis on the effort placed into developing LLRF automation tools to support the commissioning of such a large scale accelerator. The first results of the LLRF commissioning of the XFEL injector and first RF stations in the main linac are also given. | ||
![]() |
Slides THOAA3 [15.800 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THOAA3 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |