THPF015 | Status of the FAIR Heavy Ion Synchrotron Project SIS100 | 3715 |
|
||
The procurements of major technical components for the heavy ion synchrotron SIS100 are progressing. Especially the production of the long lead items, the main superconducting dipole and quadrupole magnets and the main Rf systems could be started. The system layout for the injection system and the specifications for all injection devices has been completed. In parallel, the Digital Mock-Up (DMU) and design for major extraction components has been developed. Certain technical challenges observed during the acceptance tests of First of Series (FOS) components and risks and their mitigation will be presented. | ||