Paper | Title | Page |
---|---|---|
TUPJE056 | VELA Machine Development and Beam Characterisation | 1752 |
|
||
Recent developments on the VELA (Versatile Electron Linear Accelerator) RF photo-injector at Daresbury Laboratory are presented. These are three-fold; commissioning/installation, characterising and providing beam to users. Measurements for characterising the dark current (DC), 4-D transverse emittance, lattice functions and photoinjector stability are presented. User beam set ups to provide beam for electron diffraction and Cavity Beam Position Monitor development are summarised. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPJE056 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPHA054 | Commissioning of the Transverse Deflecting Cavity on VELA at Daresbury Laboratory | 3239 |
|
||
A 9-cell S-band transverse deflecting copper cavity (TDC) has been designed and built to provide a 5 MV transverse kick in order to perform longitudinal profile measurements of the electron bunch on the Versatile Electron Linear Accelerator (VELA) at Daresbury Laboratory. The cavity has been manufactured by industry and has been field flatness tuned using a beadpull system. The cavity has then been installed on to the VELA facility and commissioned for operation with the electron beam. This paper discusses the tuning and the RF conditioning of the cavity. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPHA054 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPWI049 | Commissioning of the 112 MHz SRF Gun and 500 MHz Bunching Cavities for the CeC PoP Linac | 3597 |
|
||
Funding: Work is supported by Brookhaven Science Associates, LLC under contract No. DE-AC02-98CH10886 with the US DOE. The Coherent electron Cooling Proof-of-Principle (CeC PoP) experiment at BNL includes a short electron linac. During Phase I a 112 MHz superconducting RF photoemission gun and two 500 MHz normal conducting bunching cavities were installed and commissioned. The paper describes the Phase I linac layout and presents commissioning results for the cavities and associated RF, cryogenic and other sub-systems. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPWI049 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |