WEPMN055 RAMI Optimization-Oriented Design For The LIPAc RF Power System 3048
 
  • M. Weber, J.M. Arroyo, A. Ibarra, I. Kirpitchev, J. Mollá, P. Méndez, D. Regidor, C. de la Morena
    CIEMAT, Madrid, Spain
 
  Funding: This work has been funded by the Spanish Ministry of Economy and Competitiveness.
The Linear IFMIF Prototype Accelerator (LIPAc) is currently under construction in Rokkasho (Japan). LIPAc will generate a CW 9 MeV deuteron beam at 125 mA. It will serve to validate the final IFMIF accelerator concept and technologies. The RF power system is being integrated by CIEMAT (Spain) in collaboration with its partner companies and European institutes. LIPAc RF Power System design has been performed aiming high reliability, high availability and easy maintainability to address one of the most important requirements for IFMIF. The target of LIPAc tests is to validate the technologies and designs for the final phase of IFMIF. Several improvements in reliability, availability and maintainability have been implemented in the LIPAc RF power System. These improvements are based on both, new technologies and new maintenance philosophy. The results of their first tests are shown in this paper. Additional potential improvements are also analyzed.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMN055  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMN056 High Power Testing of the First Re-buncher Cavity for LIPAC 3051
 
  • F. Toral, D. Gavela, I. Podadera, D. Regidor, M. Weber, C. de la Morena
    CIEMAT, Madrid, Spain
  • B. Bravo, R. Fos, J.R. Ocampo, F. Pérez, A. Salom, P. Solans
    ALBA-CELLS Synchrotron, Cerdanyola del Vallès, Spain
 
  Funding: This work is partially supported by the Spanish Ministry of Economy and Competitiveness under projects AIC-A-2011-0654 and the Agreement as published in BOE, 16/01/2013, page 1988
Two re-buncher cavities will be installed at the Medium Energy Beam Transport (MEBT) of the LIPAc accelerator, presently being built at Rokkasho (Japan). They are IH-type cavities with 5 gaps and will provide an effective voltage of 350 kV at 175 MHz for deuterons at 5 MeV. The first prototype has been designed at CIEMAT and built by the Spanish industry. The high power tests and RF conditioning have been successfully performed at the ALBA/CELLS RF laboratory. A solid state power amplifier, which has been developed by CIEMAT and its partner companies at Spain for the LIPAc RF System, has been used for the tests. The cavity has shown a performance according to calculations, regarding the dissipated power, peak temperatures and coupling factor. RF conditioning was started with a duty cycle of 3%, which was increased gradually till continuous wave (CW), which is the nominal working mode in LIPAc.
 