WEYB2 |
Beam Dynamics in a High Frequency RFQ |
2408 |
|
- A.M. Lombardi, V.A. Dimov, M. Garlaschè, A. Grudiev, S.J. Mathot, E. Montesinos, S. Myers, M.A. Timmins, M. Vretenar
CERN, Geneva, Switzerland
|
|
|
CERN is constructing a 750 MHz Radio Frequency Quadrupole (RFQ) which can accelerate a proton beam to 5 MeV in a length of 2 m. The beam dynamics strategic parameters have been chosen to make this RFQ a good candidate for the injector of a medical facility operating at frequency of 3 GHz. Minimising beam losses above 1 MeV, containing the RF power losses and opening the road to industrialisation have been the guidelines for an unconventional RFQ design. In this paper, the optimisation efforts, the structure design and the expected beam qualities will be detailed. The status of the construction as well as the potential for further developments will be presented.
|
|
|
Slides WEYB2 [2.166 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-WEYB2
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPF093 |
Status of the LHC Injectors Upgrade (LIU) Project at CERN |
3915 |
|
- M. Meddahi, J. Coupard, H. Damerau, A. Funken, S.S. Gilardoni, B. Goddard, K. Hanke, L. Kobzeva, A.M. Lombardi, D. Manglunki, S. Mataguez, B. Mikulec, G. Rumolo, E.N. Shaposhnikova, M. Vretenar
CERN, Geneva, Switzerland
|
|
|
CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in order to enable the delivery of beams with the challenging HL-LHC parameters. The LHC Injectors Upgrade project coordinates this massive upgrade program, and covers a new linac (Linac4 project) as well as upgrades to the Proton Synchrotron Booster, the Proton Synchrotron and Super Proton Synchrotron. The heavy ion injector chain is also included, adding the Linac3 and Low Energy Ion Ring to the list of accelerators concerned. The performance objectives and roadmap of the main upgrades will be presented, including the work status and outlook. The machine studies and milestones during LHC Run 2 will be discussed and a preliminary Long Shutdown 2 installation planning given. Finally, for the LHC Run 3, the beam performance across the full injector chain after all the upgrades will be estimated and the required commissioning stages outlined.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF093
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|