Paper | Title | Page |
---|---|---|
MOPTY001 | Development of Wideband BPM for Precise Measurement of Internal Bunch Motion | 937 |
|
||
Funding: This work was supported by MEXT KAKENHI Grant Number 25105002, Grant-in-Aid for Scientific Research on Innovative Areas titled “ Unification and Development of the Neutrino Science Frontier” To suppress intra-bunch oscillations and to reduce particle losses, the intra-bunch feedback (IBFB) system has been developed in 2014 for the J-PARC Main Ring (MR). A new BPM was also installed to the MR for the IBFB system. This BPM has a sufficient frequency response and position sensitivity(up to 1.5GHz within 15% fluctuation ). However, a better performance may be needed in future for more precise analysis of internal motions (e.g. due to an electron cloud). We report the development of the BPM and precise measurement results of the BPM characteristics. We also report simulation studies of the digital equalizer which helps to reconstructs the beam shape from beam signals. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPTY001 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUYB1 | Progress of SuperKEKB | 1291 |
|
||
This presentation will cover the status of the installation and the injector commissioning status of SuperKEKB. The IR optics and design with very low β* of less than 1 mm will be discussed. | ||
![]() |
Slides TUYB1 [6.588 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUYB1 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUBC1 | Recent Progress and Operational Status of the Compact ERL at KEK | 1359 |
|
||
Funding: Work supported by the Photon and Quantum Basic Research Coordinated Development Program from the MEXT, and by the MEXT grant for promoting technology for nuclear security. The Compact Energy Recovery Linac (cERL) is a superconducting test accelerator aimed at establishing technologies for the ERL-based future light source. After its construction during 2009 to 2013, the first CW beams of 20 MeV were successfully transported through the recirculation loop in February 2014*. Then, initial tuning of beams and evaluations of beam properties were carried out. From September to December in 2014, we are constructing a Laser Compton Scattering (LCS) source** which aims at demonstrating technology for the future high-flux quasi-monochromatic gamma-ray source. In the next run of the cERL, which begins at the end of January 2015, we plan such works as an increase in the beam current (from 10 uA to 100 uA), commissioning of the LCS source, and sustained tuning of beams for lower emittance. We will report up-to-date results of these developments. * N. Nakamura et al., IPAC2014, MOPRO110; S. Sakanaka et al., LINAC14, TUPOL01. ** R. Nagai et al., IPAC2014, WEPRO003. |
||
![]() |
Slides TUBC1 [2.679 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUBC1 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |