Author: Speirs, D.C.
Paper Title Page
WEPTY032 MICE Cavity Installation and Commissioning/Operation at MTA 3342
 
  • M.A. Leonova, M. Backfish, D.L. Bowring, A.V. Kochemirovskiy, A. Moretti, D.W. Peterson, M. Popovic, Y. Torun, K. Yonehara
    Fermilab, Batavia, Illinois, USA
  • B.T. Freemire
    IIT, Chicago, Illinois, USA
  • C. Hunt
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
  • P.G. Lane
    Illinois Institute of Technology, Chicago, Illinois, USA
  • T.H. Luo
    LBNL, Berkeley, California, USA
  • D.C. Speirs, C.G. Whyte
    USTRAT/SUPA, Glasgow, United Kingdom
  • T. Stanley
    STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
 
  A first electropolished 201-MHz RF cavity for the international Muon Ionization Cooling Experiment (MICE) has been assembled inside a special vacuum vessel and installed at the Fermilab's MuCool Test Area (MTA). The cavity and the MTA hall have been equipped with numerous instrumentation to characterize cavity operation. The cavity has been commissioned to run at 14 MV/m gradient with no external magnetic field; it is also being commissioned in presence of fringe field of a multi-Tesla superconducting solenoid magnet, the condition in which cavity modules will be operated in the MICE cooling channel. The assembly, installation and operation of the Single-Cavity Module gave valuable experience for operation of full-size modules at MICE.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPTY032  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)