Paper | Title | Page |
---|---|---|
TUPJE070 | Preliminary Experimental Investigation of Quasi Achromat Scheme at Advanced Photon Source | 1800 |
|
||
Funding: Work supported by the U.S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357. Next generation storage rings require weaker dipole magnets and stronger quadrupole focusing to achieve very low emittance. To suppress the geometric and chromatic optics aberrations introduced by the strong sextupoles, achromat and quasi achromat schemes are applied in the lattice design to improve the beam dynamics performance. In this paper, some preliminary experimental investigation of the quasi achromat scheme at the Advanced Photon Source (APS) are presented. Three different operation lattices are compared on their beam dynamics performance. Although none of these operation lattices achieve ideal quasi achromat condition, they have certain relevant features. It is observed that fewer resonances are present in the nominal operation lattice which is most close to quasi achromat required conditions. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPJE070 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPJE079 | High Charge Development of the APS Injector for an MBA Upgrade | 1828 |
|
||
Funding: Work supported by the U.S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357. The APS MBA (multi-bend achromat) upgrade storage ring will employ a “swap out” injection scheme and requires a single-bunch beam with up to 20 nC from the injector. The APS injector, which consists of a 450-MeV linac, a particle accumulator ring (PAR), and a 7-GeV synchrotron (Booster), was originally designed to provide up to 6 nC of beam charge. High charge injector study is part of the APS upgrade R&D that explores the capabilities and limitations of the injector through machine studies and simulations, and identifies necessary upgrades in order to meet the requirements of the MBA upgrade. In the past year we performed PAR and booster high charge studies, implemented new ramp correction of the booster rap supplies, explored non-linear chromatic correction of the booster, etc. This report presents the results and findings. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPJE079 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |