Paper | Title | Page |
---|---|---|
TUBD2 | Final Cooling For a High-luminosity High-energy Lepton Collider | 1384 |
|
||
Funding: Fermilab is operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the U. S. Department of Energy. The final cooling system for a high-energy high-luminosity muon collider requires reduction of the transverse emittance by an order of magnitude to ~0.00003 m (rms, N), while allowing longitudinal emittance increase to ~0.1m. In the present baseline approach, this is obtained by transverse cooling of low-energy muons within a sequence of high field solenoids with low-frequency rf systems. Recent studies of such systems are presented. Since the final cooling steps are actually emittance exchange a variant form of that final system can be obtained by a round to flat transform in x-y, with transverse slicing of the enlarged flat transverse dimension followed by longitudinal recombination of the sliced bunchlets. Development of final exchange following lowest-emittance cooling is discussed. |
||
![]() |
Slides TUBD2 [1.976 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUBD2 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |