Author: Saotome, H.S.
Paper Title Page
MOPHA059 Control System Upgrade for SuperKEKB Injector Linac 930
 
  • M. Satoh, K. Furukawa, K. Mikawa, F. Miyahara, Y. Seimiya, T. Suwada
    KEK, Ibaraki, Japan
  • T. Kudou, S. Kusano
    Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
  • H.S. Saotome, M. Takagi
    Kanto Information Service (KIS), Accelerator Group, Ibaraki, Japan
 
  Toward SuperKEKB project, the electron/positron injector linac upgrade is ongoing at KEK in order to deliver the low emittance electron/positron beams with high bunched charge intensity and small emittance. A large number of accelerator components and control devices will be newly installed before the autumn of 2014. Finally, we are aiming at the simultaneous top-up operation for the four independent storage rings including two light sources. The high availability and reliability of control system is strongly required for the long-term stable beam operation under such complex operation schemes. In this presentation, we will describe the control system upgrade plan and status.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPHA059  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)