Author: Piekarski, J.
Paper Title Page
TUAD3 LLRF Commissioning of the European XFEL RF Gun and Its First Linac RF Station 1377
 
  • J. Branlard, G. Ayvazyan, V. Ayvazyan, Ł. Butkowski, M.K. Grecki, M. Hoffmann, F. Ludwig, U. Mavrič, M. Omet, S. Pfeiffer, K.P. Przygoda, H. Schlarb, Ch. Schmidt, H.C. Weddig, B.Y. Yang
    DESY, Hamburg, Germany
  • S. Bou Habib, K. Czuba, M. Grzegrzółka, E. Janas, K. Oliwa, J. Piekarski, K.T. Pozniak, I. Rutkowski, R. Rybaniec, D. Sikora, W. Wierba, L.Z. Zembala, M. Żukociński
    Warsaw University of Technology, Institute of Electronic Systems, Warsaw, Poland
  • W. Cichalewski, D.R. Makowski, A. Mielczarek, P. Perek
    TUL-DMCS, Łódź, Poland
  • A. Piotrowski
    FastLogic Sp. z o.o., Łódź, Poland
 
  The European X-ray free electron laser (XFEL) at the Deutsches Elektronen-Synchrotron (DESY), Hamburg Germany is in its construction phase. Approximately a third of the super-conductive cryomodules have been produced and tested. The RF gun is installed since 2013; periods of commissioning are regularly scheduled between installation phases of the rest of the injector. The first linac, L1, consisting of 4 cryomodules powered by one 10 MW klystron is installed and being commissioned. This contribution reports on the installation and preparation work of the low-level radio frequency system (LLRF) to perform the commissioning of the XFEL first components. The commissioning plans, schedule and first results are presented.  
slides icon Slides TUAD3 [14.016 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUAD3  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)