Paper | Title | Page |
---|---|---|
MOPHA030 | Commissioning of the Low-Noise MTCA.4-based Local Oscillator and Clock Generation Module | 847 |
|
||
Funding: Helmholtz Validation Fund Project "MicroTCA.4 for Industry" Within the Helmholtz Validation Fund Project "MicroTCA.4 for Industry", DESY together with collaboration partners from industry and research developed a compact fully MicroTCA chassis-integrated local RF oscillator module. The local oscillator and clock generation module generates a low noise local oscillator out of the global reference that is distributed over the accelerator. The module includes a splitting section which provides 9 local oscillator signals which are distributed over the RF-Backplane to the rear-transition modules. Similarly, the clock signal is also generated out of a single reference input by means of low-noise dividers. The clock is then fan-out to 22 differential lines that are routed over the RF backplane to the rear-transition modules. The functional block is implemented such that it fits in the rear slots 15 and 14 of a standard MTCA.4 crate. In the paper the commissioning results measured on the L3 low-level RF stations of the European XFEL will be presented. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPHA030 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUAD3 | LLRF Commissioning of the European XFEL RF Gun and Its First Linac RF Station | 1377 |
|
||
The European X-ray free electron laser (XFEL) at the Deutsches Elektronen-Synchrotron (DESY), Hamburg Germany is in its construction phase. Approximately a third of the super-conductive cryomodules have been produced and tested. The RF gun is installed since 2013; periods of commissioning are regularly scheduled between installation phases of the rest of the injector. The first linac, L1, consisting of 4 cryomodules powered by one 10 MW klystron is installed and being commissioned. This contribution reports on the installation and preparation work of the low-level radio frequency system (LLRF) to perform the commissioning of the XFEL first components. The commissioning plans, schedule and first results are presented. | ||
![]() |
Slides TUAD3 [14.016 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUAD3 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |