Author: Pan, W.M.
Paper Title Page
THPF055 Status of the Superconducting Cavity Development at IHEP for the CADS Linac 3824
 
  • F.S. He, J.P. Dai, J. Dai, X. Huang, L.H. Li, Z.Q. Li, Q. Ma, Z.H. Mi, B. Ni, W.M. Pan, X.H. Peng, T. Qi, P. Sha, G.W. Wang, Q.Y. Wang, Z. Xue, X.Y. Zhang, G.Y. Zhao
    IHEP, Beijing, People's Republic of China
  • H. Huang, H.Y. Lin
    Institute of High Energy Physics (IHEP), Chinese Academy of Sciences, Beijing, People's Republic of China
 
  IHEP (Institute of High Energy Physics) is developing a CW 10MeV proton injector and part of the 25MeV main linac for the CADS project. 14 SRF (superconducting radio frequency) spoke-012 cavities for the injector, as well as 6 SRF spoke-021 cavities for the main linac are to be beam commissioned before middle of 2016; meanwhile, VT (vertical test) of two more types of prototype cavities are to be finished with 2015, for the future phases of the project. In this paper, the VT statistics of 10 spoke012 cavities, 4 spoke021 cavities, and a 5-cell β0.82 elliptical cavity are reported; the cavity performance during beam commissioning of the TCM (test cryomodule) is reported as well.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF055  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPF057 Beam Commissioning of C-ADS Injector-I RFQ Accelerator 3827
 
  • C. Meng, J.S. Cao, Y.Y. Du, H. Geng, T.M. Huang, R.L. Liu, H.F. Ouyang, W.M. Pan, S. Pei, H. Shi, Y.F. Sui, J.L. Wang, S.C. Wang, F. Yan, Q. Ye, L. Yu, Y. Zhao
    IHEP, Beijing, People's Republic of China
 
  The C-ADS accelerator is a CW (Continuous-Wave) proton linac with 1.5 GeV in beam energy, 10 mA in beam current, and 15 MW in beam power. C-ADS Injector-I accelerator is a 10-mA 10-MeV CW proton linac, which uses a 3.2-MeV normal conducting 4-Vane RFQ and superconducting single-spoke cavities for accelerating. The frequency of RFQ accelerator is 325 MHz. The test stand composed of an ECR ion source, LEBT, RFQ, MEBT and beam dump have been installed and the first stage of beam commissioning have been finished at IHEP in 2014 mid-year. At 90% duty factor, we got 11 mA proton beam at RFQ exit with 90% beam transmission efficiency, while 95% beam transmission efficiency at 70% duty factor. The energy after RFQ was measured by TOF method with FCTs. The transverse emittance measured by double-slits emittance meter was 0.135 π mm-mrad, which of detailed data analysis will be presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF057  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)