MOPWA028 |
Resonance Compensation for High Intensity Bunched Beams |
159 |
|
- G. Franchetti, S. Aumon, F. Kesting, H. Liebermann, C. Omet, D. Ondreka, R. Singh
GSI, Darmstadt, Germany
|
|
|
Mitigation of periodic resonance crossing induced by space charge is foreseen via classic resonance compensation. The effect of the space charge is, however, not obvious on the effectiveness on the compensation scheme. In this proceeding we report on an experimental campaign performed at SIS18 in an attempt to investigate experimentally the effect of space charge on the resonance compensation. The experimental results and their consequences are discussed through numerical simulations.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-MOPWA028
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMA020 |
SIS100 Dipole Field Harmonics and Dynamic Aperture Calculations |
2795 |
|
- C. Omet, E.S. Fischer, G. Franchetti, V. Kornilov, A. Mierau, C. Roux, P. Schnizer, D. Schäfer, S. Sorge, P.J. Spiller, K. Sugita
GSI, Darmstadt, Germany
|
|
|
During the acceptance test of the First of Series (FoS) SIS100 super-ferric dipole, detailed field measurements have been done. The harmonic coefficients have been extracted from these and dynamic aperture simulations have been done which are presented here. Furthermore, geometric precision measurement tools for the magnet have been developed to track down the field errors to geometric errors. Finally, mitigation actions have been taken to reduce these errors during manufacturing to ensure the design beam survival rate in SIS100.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMA020
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPF015 |
Status of the FAIR Heavy Ion Synchrotron Project SIS100 |
3715 |
|
- P.J. Spiller, U. Blell, L.H.J. Bozyk, J. Ceballos Velasco, T. Eisel, E.S. Fischer, O.K. Kester, H.G. König, H. Kollmus, V. Kornilov, P. Kowina, J.P. Meier, A. Mierau, C. Mühle, C. Omet, D. Ondreka, N. Pyka, H.R. Ramakers, P. Rottländer, C. Roux, P. Schnizer, St. Wilfert
GSI, Darmstadt, Germany
|
|
|
The procurements of major technical components for the heavy ion synchrotron SIS100 are progressing. Especially the production of the long lead items, the main superconducting dipole and quadrupole magnets and the main Rf systems could be started. The system layout for the injection system and the specifications for all injection devices has been completed. In parallel, the Digital Mock-Up (DMU) and design for major extraction components has been developed. Certain technical challenges observed during the acceptance tests of First of Series (FOS) components and risks and their mitigation will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF015
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|