Paper | Title | Page |
---|---|---|
WEPTY084 | Cooling Systems for the New 201.25 MHz Final Power Amplifiers at Los Alamos Neutron Science Center (LANSCE) | 3479 |
|
||
Funding: Los Alamos National Laboratory, an affirmative action/equal opportunity employer, is operated by the University of California for the U.S. Department of Energy under contract W-7405-ENG-36. Two new 201.25 MHz RF Final Power Amplifiers (FPAs) have been designed, fabricated, assembled, installed and successfully tested at the Los Alamos Neutron Science Center (LANSCE), in Module 2 of the Drift Tube Linac. These production units were fabricated at Continental Electronics Corporation. In this paper, we summarize the FPAs air and water cooling requirements and cooling systems. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPTY084 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |