Paper |
Title |
Page |
THPF039 |
Stability Studies for J-PARC Linac Upgrade to 50 mA/400 MeV |
3785 |
|
- Y. Liu, T. Maruta
KEK/JAEA, Ibaraki-Ken, Japan
- K. Futatsukawa, T. Miyao
KEK, Ibaraki, Japan
- M. Ikegami
FRIB, East Lansing, Michigan, USA
- A. Miura
JAEA/J-PARC, Tokai-mura, Japan
|
|
|
J-PARC linac applies the Equi-partitioning (EP) setting as the base-line design. And it is the first machine to adopt this approach at the design stage. EP condition is a natural solution for avoiding emittance exchange between transverse and longitudinal planes. At J-PARC linac it is also possible to explore off-EP settings. One of the motivations could be a lattice with relaxed envelope for mitigating the intra-beam stripping (IBSt) effects in high current H− beam. During and after the energy upgrade in Jan., 2014 and beam current upgrade in Oct., 2014, experiments were carried out to study the stability and emittance evolution for the EP and off-EP settings with high current H− beam at J-PARC linac for better choices of lattice and better understanding.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF039
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPF040 |
Recent Progress of the Beam Commissioning in J-PARC Linac |
3789 |
|
- T. Maruta, Y. Liu
KEK/JAEA, Ibaraki-Ken, Japan
- K. Futatsukawa, T. Miyao
KEK, Ibaraki, Japan
- M. Ikegami
FRIB, East Lansing, Michigan, USA
- A. Miura
JAEA/J-PARC, Tokai-mura, Japan
|
|
|
J-PARC linac iis replaced the front-end in the summer shutdown in year 2014 to extend the maximum peak current to 50 mA from 30 mA. By the combination with the energy upgrade conducted in year 2013, it becomes possible to achieve the design beam energy of 133 kW, which is corresponding to 1 MW at the extraction of 3 GeV Rapid Cycling Sychrotron (RCS). The beam commissioning after the replacement started at Sep./27, and we can successfully accelerate the beam at peak current of 30 mA and 50 mA. In this presentation, we introduce the resent progress of the beam commissioning of the J-PARC linac.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF040
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|