Paper | Title | Page |
---|---|---|
MOPWA024 | Estimation of the Ion Density in Accelerators using the Beam Transfer Function Technique | 147 |
|
||
Funding: Funded by the federal ministry of education and science of Germany The ELSA stretcher ring of Bonn University serves external hadron physics experiments with a quasi continuous electron beam of up to 3.2 GeV energy. Ions, being generated by collisions of the circulating electrons with the residual gas molecules, accumulate inside the beam potential, causing incoherent tune shifts and coherent beam instabilities. Detailed measurements were carried out in which ion dynamics is studied in dependence of beam energy and current, filling patterns and bias voltages of the ion clearing electrodes. By measuring the beam transfer function using a broadband transversal kicker, we were able to derive an estimate of the average ion density from the shift and broadening of the tune peak. In this contribution first results of these measurements are presented. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPWA024 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPWA018 | Progress Report of the Berlin Energy Recovery Project BERLinPro | 1438 |
|
||
Funding: Work supported by German Bundesministerium für Bildung und Forschung, Land Berlin, and grants of Helmholtz Association The Helmholtz Zentrum Berlin is constructing the Energy Recovery Linac Project BERLinPro on its site in Berlin Adlershof. The project is intended to expand the required accelerator physics and technology knowledge mandatory for the design, construction and operation of future synchrotron light sources. The project goal is the generation of a high current (100 mA), high brilliance (norm. emittance below 1 mm mrad) cw electron beamat 2~ps rms bunch duration or below. The planning phase of the project is completed and the design phase of most of the components is finished. Many of them have already been ordered. After some delay the construction of the building has started in February 2015. The status of the various subprojects as well as a summary of current and future activities will be given. Major project milestones and details of the project time line will be finally introduced. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPWA018 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |