Author: Meng, W.
Paper Title Page
WEPJE033 The Progress of Funnelling Gun High Voltage Condition and Beam Test 2735
 
  • E. Wang, I. Ben-Zvi, D.M. Gassner, R.F. Lambiase, W. Meng, A.I. Pikin, T. Rao, B. Sheehy, J. Skaritka
    BNL, Upton, Long Island, New York, USA
  • M.A. Ackeret, J.R. Pietz
    Transfer Engineering and Manufacturing, Inc, Fremont, California, USA
  • E. Dobrin, R.C. Miller, K.A. Thompson, C. Yeckel
    Stangenes Industries, Palo Alto, California, USA
  • O.H. Rahman
    Stony Brook University, Stony Brook, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
A prototype of a high average current polarized electron funneling gun as an eRHIC injector has been built at BNL. The gun was assembled and tested at Stangenes Incorporated. Two beams were generated from GaAs photocathodes and combined by a switched combiner field. We observed the combined beams on a YAG crystal and measured the photocurrent by a Faraday cup. The gun has been shipped to Stony Brook University and is being tested there. In this paper we will describe the major components of the gun and recent beam test results. High voltage conditioning is discussed as well.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPJE033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPWI054 Design and Test of the RHIC CMD10 Abort Kicker 3612
 
  • H. Hahn, M. Blaskiewicz, K.A. Drees, W. Fischer, W. Meng, J.-L. Mi, C. Montag, C. Pai, J. Sandberg, N. Tsoupas, J.E. Tuozzolo, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Planned and unplanned thyratron pre-fire triggered beam dumps have been observed in the yellow ring that were associated with quenches of the superconducting main ring magnets as the proton intensities increased in the FY1013 run. The increasing vacuum level indicated beam induced kicker ferrite heating causing lower magnetic kick field at a nominal pulse current. In anticipation of higher current and shorter bunches in FY2015 an accelerator improvement program was initiated to reduce the longitudinal coupling impedance with changes to the eddy-current strip geometry using Opera simulations and to change the CMD5005 to CMD10 ferrite. Results of the standard impedance measurements and of pulse current in heating tests to 170 °C are reported. All 10 dump kickers are being modified and are encapsulated with a cooling system for installation in the rings.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPWI054  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)