Hardware Improvements and Beam Commissioning of the Booster Ring in Taiwan Photon Source |
1741 |
|
- H.-J. Tsai, C.-T. Chen, J.Y. Chen, M.-S. Chiu, P.C. Chiu, P.J. Chou, K.T. Hsu, K.H. Hu, C.-C. Kuo, Y.-C. Liu, G.-H. Luo, F.H. Tseng
NSRRC, Hsinchu, Taiwan
|
|
|
Taiwan Photon Source (TPS), a low emittance 3-GeV third-generation synchrotron light source, began its hardware integration testing, safety checkout and beam commissioning on August 12, 2014 [1]. The booster ring and the storage ring share the same tunnel in a concentric fashion; the booster ring has circumference 496.8 m, the largest among light source facilities in operation. A combined-function FODO lattice is adopted for the booster ring with natural emittance 10 nm-rad. After hardware improvements were completed, the commissioning of the beam in the booster ring began on December 12 and attained the 3-GeV design energy on December 16.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPJE053
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|