Paper | Title | Page |
---|---|---|
TUPJE069 | Fast Injection System R&D for the APS Upgrade | 1797 |
|
||
Funding: Results in this report are derived from work performed at Argonne National Laboratory. Argonne is operated by UChicago Argonne, LLC, for the U.S. Department of Energy under contract DE-AC02-06CH11357. The MBA upgrade for the APS will operate with bunch swap out and on axis injection. The planned 324 bunch fill pattern places difficult demands on the injection and extraction kickers. The present concept uses dual stripline kickers driven by high Voltage pulsers. Minimizing perturbation on adjacent bunches requires very fast rise and fall times with relatively narrow ~20 nsec, 15 kV pulses. To achieve these requirements we have initiated a multifaceted R&D program. The R&D includes the HV pulser, stripline kicker and HV feedthrough. We have purchased a commercial dual channel HV pulser and are evaluating its performance and reliability. In addition, we are investigating the feasibility of using nonlinear ferrite loaded coaxial cables (shockwave transmission line) to sharpen the leading and trailing edges of high voltage pulses. We are also developing a prototype kicker and high voltage feedthrough. The requirements for injection and extraction, progress on prototype development and results of our HV pulser investigations will be reported. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPJE069 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |